ENGINE MANUFACTURING | ASSEMBLY-LINE RELIABILITY
Six Months In, the Customer Didn't Just Reorder — They Sent Us Four Other Buyers
The Application
A generator engine manufacturing floor running a 10-trolley fleet feeding a continuous assembly line at 600-800 kg per trolley.
The Challenge
Swivel castors were failing every six months. High push-pull effort was disrupting assembly handovers and slowing material flow to the line.
The Muvtons Solution
Muvtons matched a donut-profile, low-rolling-resistance wheel (GGSE Series) precisely to the confirmed load range, validating performance through a customer-run six-month trial before committing to full rollout.
GGSE-62R-ME-LE
GGSE-62S-ME-TL-LE
The Result
69%
Lower Annual
Cost
100%
Performance Retention
Across the 6-Month Trial
4x
Longer Projected
Castor Life
4
Unprompted Vendor
Referrals
Muvtons delivered consistent performance across six months, reduced push-pull effort, improved trolley movement, and extended castor life.
Could Your Facility Be the Next Success Story?
Book a 30-minute floor walk with the Muvtons team to identify the right castor and wheel solution for your floor, load and movement conditions.
*Customer identity withheld to protect competitive information. All figures verified against Muvtons project records.